![]() |
Nerissa at the dock in Cowes, Isle of Wight |
![]() |
|
|
|
![]() |
Setting out the molds on the scrive board from the computerised hull profile supplied by the designer |
![]() |
Building up the keel from iroko boards with West Resin glue followed by the hog. Additional security supplied by coach screws from the base as the design does not include keel bolts except in the way of the ballast keel. |
![]() |
Waisting the after end of the keel to ensure a better flow to the auxilliary outboard motor |
![]() |
Laminating the fashion piece to the transom to make a broader land for the strakes |
